Customer Results
See how plants cut costs and eliminate downtime with the FC-200. These field-proven results show real ROI across injection molding and laser cutting operations.
Precision Plastics: Injection Molding, Texas
Challenge
Twelve legacy fixed-speed chillers drove high energy bills and triggered constant summer alarms and shutdowns.
Solution
Full replacement with FC-200 VFD units and IoT centralized monitoring.
Results
- Energy consumption reduced 31%
- Annual electricity savings $86,000
- Payback period 18 months
LaserWerk GmbH: Laser Cutting, Germany
Challenge
Laser cooling was unstable during summer heat, causing costly production halts.
Solution
Custom FC-200 high-ambient units installed in dual-unit parallel redundancy.
Results
- Downtime reduced 92%
- Passed CE / UL on-site audit
- Zero-fault operation for two consecutive summers